PROJECT LIST

 

Over the years, TTS International has contributed to a great deal of projects, to the satisfaction of her clients.  For your information, you will find a list of those projects below, with a brief description of the works that were carried out.  Naturally, should you wish to learn more about any of those projects, you are invited to contact us at any time.
 

Principals

Project Location

Work Description

Year

E.T.A.

Abu Dhabi

Placement of various equipment (tanks, generators, cable pulling equipment) at the Landmark Tower Project

2010

Fabtech

Jebel Ali –Goa

Load-out & offloading by barge of 400T Ship-Build Platform Sections

2010

RAK Precast

Ruwais

Transportation & erection of pipeline bridge, Ruwais Bypass Rd Project

2010

Mitsubishi Heavy Industries

Dubai

DubaiMetro Project – placement of various machinery

2010

Amana

EMAL Abu Dhabi

Transportation of conveyor structures

2010

Deugro

Dubai

Placement of transformers –Umm Suqueim BusinessBay

2010

Wartsila

Abu Dhabi

Exchange of engines at several military bases

2009/10

Wartsila

Dubai

Tabreed – generator transportation and placement

2010

Dubal

Dubai

Exchange of several 12T transformers

2010

SBM

Musafah Abu Dhabi

Weighing and shifting of 12,500T MOPUStor

2010

Mubadala

Al Ain

Placement of autoclaves

2010

DongBang

Abu Dhabi

Transportation of 30m girders, Salam Street Tunnel Project

2010

Grandweld

Jadaf, Dubai

Jacking and transportation of 180T boat

2009

BK Gulf

Dubai

Transportation and placement of transformers

2009

Deugro

Dubai

Transportation and installation of shunt reactors, DIP

2009

Al Maha

Fujairah

Transportation and installation of generator and transformer

2009

Sharaf Shipping

Dubai

Transportation and installation of three transformers – Jebel Ali

2009

Galadari

Sharjah

Installation of MAN Roland printing press lines

2009

Khaladiyah Shipping

Musafah Abu Dhabi

Transportation of 108T drums

2009

Capital Star Shipping

Jebel Ali

Internal shifting of 275T transformer

2009

Various clients

UAE-wide

Transportation of overhead cranes

2009

ETA

Abu Dhabi

Placement of chiller units

2009

Straight Line Cargo

Jebel Ali – Salalah

Transportation of 33m long sailing mast

2009

Sharaf Logistics

SalalahOman

Transportation of 475T column

2009

Gallagher

Umm Al Quwain

Transportation of newly built tugboat

2009

Waagner Biro

Hamriyah –Dubai

Transportation of pedestrian bridges

2009

Spatial Composite

Sharjah / RAK

Jacking and transportation of Boeing 737 fuselage

2009

FBM KNM

Jebel Ali

Transportation of rectors

2009

Union Cement

Ras Al Khaimah

Change-out of motor

2009

Dubal

Jebel Ali

Change-out of hydraulic press units

2009

Sejong Emirates

Jebel Ali

Transportation of stack sections, 14m long x7 m diameter, 40T

2009

United Printing Press

Shahama, AUH

Load-out of accommodation module on Leighton Stealth

2009

Toledo

Zabeel Park

Placement of five chillers

2009

Wartsila

UAE

Transportation of engines between factory and plant/port, up to 240T

2009

Dragon Offshore

Hamriyah, Sharjah

Shifting of 120T spudcans

2009

Logistics International

Abu Dhabi

Drydocking of 1,700T vessel

2009

Gulftainer

Sharjah

Shifting of container cranes

2009

Alderley

Jebel Ali

Jacking and shifting of various skids

2007/09

United Arab Shipping

Dubai

Shifting of pontoons

2009

Etihad Airways

Abu Dhabi

Lifting of flight simulator

2009

Wehrhahn

Musafah Abu Dhabi

Shifting of autoclaves

`2008

Al Mereikhi

ShowaIsland, AUH

Transportation of 90T girders from Ashoosh to Showa Island

2009

SF Marina

UAE

Transport of pontoons up to 6m wide, 80T to Mina Zayed

2008/09

SBM

Musafah Abu Dhabi

Weighing of 11,000T MopuStor

2009

BK Gulf

Burj Dubai

FountainLake- Lowering and placement of air tanks

2009

Danem Engineering

Hamriyah

Shifting of Diverters

2008/09

Al Mereikhi

Taweelah, AUH

Transportation of 90T girders, Ashoosh –KhalifaPort, 900 beams

2008/09

BK Gulf

Burj Dubai

FountainLake- Lowering and placement of transformers

2009

DBB/CCC jv

Burj Dubai Mall

Placement of Sonic Hopper pole

2008

DBB/CCC jv

Burj Dubai Mall

Lowering of Fokker aeroplane sections

2008

EMAL

Taweelah Emirates Aluminium Project

Offloading of potshells by means of gantry

2008/09

Agility

Sharjah / Kabul

Receiving 90T engines from Antonov planes in Kabul; transport to site outside Kabul

2008/09

Drake & Scull

Motor City, Dubai

Installation of pre-assembled chillers for district cooling, up to 50T each

2008

AllSeas Engineering BV

Iran

South Pars, phase 8 – Bushehr, Khor AmShahr - pipeline installation

2008/09

Deugro

Dubai, Al Ain

Installation of transformers at various locations, up to 130T each

2008/09

Projex

Ghantout /Iran

Relocation of desalination plant incl. transportation & barging, pieces up to 180 T

2008

Majan Shipping

Muscat Oman Refinery

Transportation & installation of 2 generators & 2 turbines, up to 100 T

2008

AalborgIndustries

Hamriyah FZE

Transportation, lifting / mating of boiler skids, weight 270T each

2008

Global Ship Logistics

Hamriya FZE / Dubai Drydock

Load-out, seafastening & barging of three FPSO boilers weight 270T each

2008

Grand Weld

Jadaf, Dubai

Transportation of four fully assembled crewboats, weight 180T each

2008

Al Shabia

Hamriyah

Transportation of subsea load spreaders up to 58m long, 150T each

2008

Al Faris

ICAD

Placing of presses of 250T each using strand jacks

2008

DBB/CCC jv

Burj Dubai Mall

Pulling of roof structure with strand jacks

2008

Aker Kvearner

Hamriyah FZE / Dubai Drydocks

Transportation, load-out, seafastening and barging of ship sections ith weights of up to 270T each

2008

EMAS

Hamriyah FZE

Transportation, load-out, seafastening of ten compressor skids, 250T ea

2008

Dutco Balfour Beatty

Sh Zayed Road interchange 5.5

Relocation of completely assembled construction bridges

2008

Archirodon

Sh Zayed Bridge 3rd crossing, AUH

Transportation of tower sections, main beams and arches, weights up to 525T from Jebel Ali onto client’s barge

2007/08

Overseas AST

Dubai

Transportation & erection of pedestrian bridges throughout Dubai

2007/08

Hijaz International

Bahrain

Lifting of 26T chillers onto 200m high-rise building using winch system

2007

Johnson Arabia

Dubai

Installation of 90T pier caps, Dubai Metro Project, using 4-pt lifting syst

2007

Spatial

Dubai

Relocation of completely assembled aircraft simulator

2007

Overseas AST

YasIsland

Transportation of bridge girders for Saadiyat Island Bridge, providing engineering, management, supervision and personnel for the installation

2007

BK Gulf

Palm Island

Installation of Heat Exchangers

2007

ACMT

Palm Island

Lifting and placing of acrylic panels for Aquarium

2007

Al Faris

Hamriyah

Transportation of ammonia plant units up to 40x3.5x4.5m, up to 350T

2007

QGM

Hamriyah

Transportation of spudcans

2007

Dubai Dry Dock

Hamriyah – Dubai

Transportation & load-out of ship sections of 270T (10x20x10m)

2006

National Cement

Dubai

Removal of 200T concrete blocks from 5m high foundations using skidding/jacking and gantry

2006

Turbine Air Systems

Dubai

Transportation of chiller units

2006/07

Various clients

UAE

Transportation of various crawler cranes in different sizes

 

Gulf Extrusions

Dubai

Transportation of various steel structures, Jebel Ali – Dubai Airport Expansion project

2005/06

Danway

Dubai

Removal & re-installation of various transformers within Dubal premises

2004-06

ADC Cranes

Dubai

Transportation of overhead cranes, 35x8m, Jebel Ali – Dubai Airport

2006

Excel Engineering

Ajman-Dubai

Transportation of 30x9m nosedock sections for Emirates Engineering

2006

A&P

Dubai Festival City

Installation of air handling equipment

2006

Swiss International

Burj Dubai Mall

Installation of air handling equipment

2006

Jan de Nul

Dubai – Sudan

Loading, transportation & offloading of Jerommeke dredger by means of submerging barge

2006

DBB/CCC jv

Burj Dubai Mall

Transportation and installation of 25T acrylic panels and tunnel sections for aquarium

2006/07

Gulf District Cooling

Burj Dubai Mall

Transportation and installation of 50T chiller units on elevated floor

2006

BK Gulf

Dubai

Jumeirah Lake Towers chiller project – transportation and installation of 90T chiller units

2006/07

Peremba-Intec-Sudan Pile Consortium

Melut Basin Oil Developm’t Project

Provision of marine equipment, engineering services and transportation of 5,500T of pipes for oil terminal from UAE to Port Sudan

2005

Peeraj Group

UAE – Dammam

Barge transportation of land rig

2005

Peremba-Intec-Sudan Pile Consortium

Melut Basin Oil Develop’t Project

Transportation from UAE to Port Sudan and offloading by submerging method of 270T SBP buoy

2005

SBM Monaco

MIS Sharjah, Jebel Ali Port

Load-out and float-off of three modules FSO (2800T), MOPU (L) (2600T) & MOPU(T) (980T) by means of submerging barge for EWT Turkmenistan

2005

Galadari Engineering

Abu Dhabi

Provision of winch and personnel for hoisting roof panels

2005

SBM Houston

Musafah – Mumbai

Transportation of 270T SPM buoy

2005

Lisa Concerts

Doha, Qatar

Management of barges for light show / firerework show

2005

Linke Kreiling GmbH / Schmidlin

Doha, Qatar

Shifting by rollers of internal bridges (22 x5x2m, 40T)

2005

A&P

Dubai Marina

Installing airhandling & chiller units inside buildings under construction

2005

York International

Umm Qasr, Iraq

Offloading of heavy lifts (ro-ro) inside Umm Qasr Port

2005

Aberdeen

Ras Al Khaimah

Removal & transportation of 6 diesel generators, 150T ea for scrapping

2005

Al Gaith Services

JA – Dxb Airport

Loading & transportation of 30 overhead cranes for Emirates Engineering, up to 39x8x2m

2005

Mannesman Dematic

Jebel Ali

Transportation & installation of overhead crane into working steel rebar factory

2005

Al Habtoor Engineering

Dubai Marina

Shifting of 8 transfomers at transformer room

2005

Al Meraikhi Precast

Abu Al Shaoum Island Bridge, AUH

Delivery & erection of 8 girders, 35m length

2005

Tiger Steel

Sharjah-Dubai

Al Nakheel Snow Dome, transportation of steel structures upto 18x9x4m

2005

Dubal

Dubai

Lifting of 2 FTA’s in position (for raising lifting height), 170T each

2005

Rohde & Liesenfeld

JA-Dubai Inv Park

Transportation of autoclave drums, 38m x 5m dia

2005

Turbine Air Systems

Dubai

Transportation, offloading & installation of chillers up to 50 T – Port Rashid – Dubai Marina

2004/05

Swiss Engineering

Dubai Airport

Installation of chillers / pumps

2004

ETA

Dubai

Placing 15 air handling units – Garden Shopping Mall

2004

Ahmed Mansoor Al A’ali

Bahrain

Shifting & erection of GT01 diverter damper

2004

Statoil Iran AS

Bushehr, Iran

Transportation of 2 AH11250 cranes from Jebel Ali to Bushehr

2004

AllSeas Engineering BV

Bushehr, Iran

South Pars, phase 6, 7, 8 – pipeline installation

2004

Tiger Steel

Sharjah – Dubai

Dubai Airport Expansion – transportation of steel works for hangars, sizes up to 38m long, 6m wide, 72T weight

2004

Al Mereikhi

Abu Dhabi

Widening of Musafah Bridge – transportation & erection of concrete bridge beams of 35x0.8m dia and 18x0.8m dia – 266 beams in total

2004

Cleveland Bridge

Dubai

Dubai Airport Expansion – transportation of steel work, sizes up to 35 m long, 6 m wide

2004

Tiger Steel

Sharjah

Transportation of bridge girders 48x3.5x4m, 78T within Sharjah Emirate

2003/04

Contech Engineering

Dubai-Sharjah

Transportation of bridge girders 48x3.5x4m, 78T to Sharjah Emirate

2003/04

ETA

Dubai

Erection of steel girders, Al Murooj Complex

2004

GPC

Abu Dhabi

Transportation & placing of bridge decks for Between Two Bridges City

2004

Weir Westgarth

Abu Dhabi

Transportation & installation of 60T desalination skids

2003

Al Mereikhi

Abu Dhabi

Transportation & erection of precast bridge beams – Abu Dhabi New Corniche Bridge

2003

Cleveland Bridge

Dubai

Transportation of steel trusses, up to 27m long, 8m wide

2003

Galadari

Khaleej Times

Installation of two new printing press lines

2003

Abu Dhabi GHQ Marine Maintenance

Abu Dhabi

Lifting and placing in the water of one 70T boat

2003

Al Nisr Publishing

Dubai

Gulf News Expansion – Installation of a new printing press line

2003

SBM / GPC

Abu Dhabi

Xikomba FPSO conversion project – load-out of modules, weight up to 1,100T

2003

SBM / GPC

Abu Dhabi

Mystras FPSO conversion project – load-out of modules, weight up to 1,100T

2003

SBM / GPC

Abu Dhabi

Husky White Rose Project – load-out of turret sections, weight up to 900T

2003

Contech Engineering

Dubai – Doha

Transportation of 27m long piles

2002

SBM

Abu Dhabi – SA

Towage of buoy from GPC – Al Kafji, Kingdom of Saudi Arabia

2002

Oman National Electric Co.

Oman

Relocation of DG set – Mudaibi – Khasab

2002

Contech Engineering

Dubai

Nad Al Sheba Millennium Grandstand – transportation & erection of 1,200T structural steel

2001

Lamprell

Sharjah Port

Rig 656 jacking work – weighing of modules

2001

GPC

Taweelah A2 proj.

Transportation & erection of pipe racks, up to 150T per section, using gantry-mounted strandjacks

2001

Noell-Imac

AUH – Taweelah

Handling / transportation of stacks from GPC to Taweelah A2

2001

York International

Deira, Dubai

Shifting of chillers at Deira Tower

2001

Peeraj Group

Saudi Arabia

Transportation of rigs from Saudi Arabia to Abu Dhabi and vice versa

2001-03

GMMOS

Sharjah

Load-out of soft yoke, Sharjah

2001

Dubai Petroleum Company

Fateh Terminal

Lifting of mooring chains, Al Wasel storage barge, utilizing strand jacks

2001

Aramco

Dammam, KSA

Handling, transportation and placing of bridge beams

2000

Ramsis Engineering

Bahrain

Alba Coke Plant – transportation of incinerators, 25m long, 7 m dia, weights between 120T and 170T

2000

Al Komed Engineering

Bahrain

Al Hawar Island Power Station – transportation & installation of miscellaneous power generation equipment

1999

The Bahrain Petroleum Company (BAPCO)

Bahrain

Sitra Wharf no. 2, BAPCO refinery – removal and re-installation of condenser unit from the waterside using a barge-mounted crane

1999

Noell Würzburg, Dubai

Condor Project, Jebel Ali

Load-out, barge transportation, offloading and placing into/onto rails of fully assembled pot room cranes

1999

Noell Projects

Maqta Bridge, AUH

Load-out, barge transportation, placing onto bearings of the Maqta Bridge.  Total weight of the main section which was placed onto its bearings in one piece was 2,700T

1999

Noell / G.P.C.

Abu Dhabi

Terra Nova Project – load-out, barge transportation and offloading into ocean-going-vessel of buoy complete with supports

1999

Noell Würzburg, Noell-Imac

Musafa, Abu Dhabi

Load-out, barge bransportation, offloading and placing into/onto rails of fully assembled container cranes, RGG’s and RMG’s from Abu Dhabi to various destinations around the world

1998 - 2003

Technip Calberson / Barwil

Ras Al Khaimah

Transportation of various heavy lift items from Port Rashid, Dubai to Ras Al Khaimah Cement Factory

1998-99

Abu Dhabi PWD/Overseas AST

Abu Dhabi

Twin Water Transmission Project – Pulling pipelines onshore by means of a rolling system and gantries

1998

Comsip / Min of Electricity

Bahrain

Relocation of various 150 MVA transformers

1998

The Bahrain Petroleum Company (BAPCO)

Bahrain

BAPCO Refinery, Bahrain, Sitra Wharf no. 2 – Removal and reinstallation of loading arms from waterside using a crane barge

1998

Noell-Imac / Nera Maritime / Bluewater

Abu Dhabi

Load-out and barge transportation of various turret sections and tripods for shipment to various destinations around the world

1996-present

Noell Projects with Six Construct

Abu Dhabi

Site transportation. load-out, barge transportation and placing onto piers of bridge sections, 52mlong, 11m wide, erection height 11m above water level, weight up to 200T with the use of hydraulic platform trailers, ro-ro barges and two American Hoist 11250 Skyhorse placed on a barge

1998

Contech / Waagner Biro

Dubai City

Transportation of pedestrian bridges, including erection at site for Dubai Municipality

1998

Ballast Nedam

Fujairah

Van Ommeren Tank Terminal – transportation of jetty piles, up to 48 m long, from Fujairah Port to site, load-out onto barge up to lifting location

1998

Ballast Nedam / Contech

Fujairah

Van Ommeren Tank Terminal – transportation of bridge trusses, length 45m, weight 80T from Jebel Ali to Fujairah; storage handling; load-out onto barge and lifting into position using specialised dollies, ro-ro barge and Manitowoc 4000Ringer on barge

1998

Alsthom / Cegelex

Bahrain

Transportation and placing onto the foundations of transformers

1998

Liebherr

Khor Fakkan Port

Installation of container cranes

1997

Hutta Hegerfeld

Dammam port

Jacking up and re-railing of damaged container crane

1997

Metro Oil Corporation

 Fujairah

Metro Oil Refinery – Local transportation and erection of all cargo, vessels and columns for the refinery – weight up to 156T per piece

1997

H.F.M. JV

Dubai Government

Chicago Beach Tower Project – Lifting of  concrete mezzanine floor slabs and inserting them into the building

1997

Khansaheb

Thyssen/Al Futtaim

Deira City Centre Project – Installation of various escalators inside an operational shopping mall

1997

NPCC

Zadco, AUH

Erection of a 104m high new flare stack and interchange all guidelines of the various existing flares

1997

KHD Köln

Oman Ministry of Electricity

Transportation and placing onto foundations of diesel generator sets from Muscat port to various power stations along the coast and in the interior.  Unit weights up to 125T. 

1987-96

KHD Köln

Yemen Ministry of Electricity

Transportation of diesel generator sets to Aden, Abijan, Mukalla and Wadi Hydra Mout and installation onto foundations.

The operation included reinforcement of bridges, road widening and wadi crossing.  Unit weights up to 125 T

1987-96

Imodco USA, Noell-Imac, Nera Maritime

India, Korea, Singapore

Load-out and transportation of various Calm bjoys to India Korea and Singapore to a variety of local oil companies

1996-present

SBM Monaco, Noell-Imac, Nera Maritime

Various oil companies

Load-out and transportation of various Calm buoys, offshore mooring systems, soft yoke, SBM-BTM systems from Abu Dhabi to various places in the Far East.  Loads up to 750T

1996-present

Garmco / Raytheon

Aluminium Plant

Transportation and installation of aluminium rolling mill and housings

1996

GPIC

Bahrain

Transportation of all heavy equipment, including a 240T vessel for the latest expansion

1996

NSCSA  / UASC

Gulf Ports

Offloading of all heavy lift cargo in UAE ports using floating cranes

1993-95

ABB Stromberg, Vaasa

WED Mina Station, AUH Min of Electricity & Water, Sharjah

Interchanging seven used transformers with seven new units and disposing of the old units

Transportation and placing onto the foundations of various transformers for Sharjah Power Station

1995-97

IVO Helsinki

WED AUH, Al Ain & E4 station, AUH

Transportation and placing onto foundations of 4 transformers each, weights up to 84T

1996

Sharjah Port Authority

Khor Fakkan Port

Turning and relocating 2 fully assembled container cranes @ 960T each

1993

GIIC

Steel Palletising Plant

Transportation and installation of new grinding mill

1995

Costain

Das Island, AUH

Adma/Opco / Adgas LNG plant – Temporary support of process vessels and structures during concrete and steel support rehabilitation

1995

ONEC

Oman

Relocation of nine power stations in Oman – Transportation and placing onto foundations of diesel engines up to 125T and transportation & placing onto foundations of various transformers throughout Oman

1984-97

Belleli Saudi

Qatar

North Field – Providing marine transportation and load-out for nine modules of up to 1350T from Jubail to offshore Qatar

1994

Siemens

Qatar

Al Wajbah Power Station, Doha – Transportation and installation of turbines, generators and transformers up to 162T

1994

Sumitomo

Abu Dhabi, Iran

Al Ain NW, Abu Muraika;  Hormuz Island, Qesm Island, Bandar Lengeh.

Transportation and installation of transformers @ 225T each from ship’s hook to foundation.

Transportation, offloading by beaching and ro-ro operations of complete desalination plants with weights up to 98T

1988-94

Toshiba

Abu Dhabi

Al Taweelah Power Station, Lot 1A, Al Ain Power Station.

Transportation and installation of transformers from ship’s hook on to foundation.  Weights up to 335T

1992

Züblin

Ruwais, AUH

Gasco Processing Plant – Temporary support of process vessels and pipe racks during concrete support rehabilitation using specialized hydraulic lifting equipment

1992-94

Italimpianti

Sitra

Sitra Desalination Plant – transportation and installation of desal units

1983/84

GIIC

Hidd

Hidd Steel Palletising Plant – Transportation and handling of all equipment and materials for the new plant

1983/84

Fiat Italy

Umm Al Nar

Umm Al Nar Desalination Plant – Barging, including ro-ro operations of all heavy lifts and evaporators.  Weights up to 170T

 

BBC (ABB Mannheim)

Riffa

Riffa Power Station, Phase I – Transportation and installation of six turbine sets

1982-83

Sidem

Umm Al Nar

Umm Al Nar Desalination Project, phase 7&8 – Barging, including ro-ro operations of all heavy lifts and evaporators, weights up to 170 T

 

GIE

Iran

Esfahan, Bandar Abbas, Kalan Power Station – transportation by ro-ro barge from Dubai to Bandar Abbas of various heavy lifts up to 140T

 

Ital Impianti

Umm Al Nar

Ro-ro barging of evaporator blocks between Abu Dhabi port and Umm Al Nar Desalination plant of heavy lifts up to 140T

 

Krupp Germany

Delma Island, AUH

Barging two units desalination plant by ro-ro barge from Abu Dhabi Port to Delma Island (beach landing) of heavy lifts up to 85T