PROJECT LIST
Over the years, TTS International has
contributed to a great deal of projects, to the satisfaction of her
clients. For your information, you will
find a list of those projects below, with a brief description of the works that
were carried out. Naturally, should you
wish to learn more about any of those projects, you are invited to contact us
at any time.
Principals |
Project Location |
Work Description |
Year |
E.T.A. |
Abu Dhabi |
Placement of various equipment (tanks, generators, cable pulling equipment) at the Landmark Tower Project |
2010 |
Fabtech |
Jebel Ali –Goa |
Load-out & offloading by barge of 400T Ship-Build Platform Sections |
2010 |
RAK Precast |
Ruwais |
Transportation & erection of pipeline bridge, Ruwais Bypass Rd Project |
2010 |
Mitsubishi Heavy Industries |
Dubai |
DubaiMetro Project – placement of various machinery |
2010 |
Amana |
EMAL Abu Dhabi |
Transportation of conveyor structures |
2010 |
Deugro |
Dubai |
Placement of transformers –Umm Suqueim BusinessBay |
2010 |
Wartsila |
Abu Dhabi |
Exchange of engines at several military bases |
2009/10 |
Wartsila |
Dubai |
Tabreed – generator transportation and placement |
2010 |
Dubal |
Dubai |
Exchange of several 12T transformers |
2010 |
SBM |
Musafah Abu Dhabi |
Weighing and shifting of 12,500T MOPUStor |
2010 |
Mubadala |
Al Ain |
Placement of autoclaves |
2010 |
DongBang |
Abu Dhabi |
Transportation of 30m girders, Salam Street Tunnel Project |
2010 |
Grandweld |
Jadaf, Dubai |
Jacking and transportation of 180T boat |
2009 |
BK Gulf |
Dubai |
Transportation and placement of transformers |
2009 |
Deugro |
Dubai |
Transportation and installation of shunt reactors, DIP |
2009 |
Al Maha |
Fujairah |
Transportation and installation of generator and transformer |
2009 |
Sharaf Shipping |
Dubai |
Transportation and installation of three transformers – Jebel Ali |
2009 |
Galadari |
Sharjah |
Installation of MAN Roland printing press lines |
2009 |
Khaladiyah Shipping |
Musafah Abu Dhabi |
Transportation of 108T drums |
2009 |
Capital Star Shipping |
Jebel Ali |
Internal shifting of 275T transformer |
2009 |
Various clients |
UAE-wide |
Transportation of overhead cranes |
2009 |
ETA |
Abu Dhabi |
Placement of chiller units |
2009 |
Straight Line Cargo |
Jebel Ali – Salalah |
Transportation of 33m long sailing mast |
2009 |
Sharaf Logistics |
SalalahOman |
Transportation of 475T column |
2009 |
Gallagher |
Umm Al Quwain |
Transportation of newly built tugboat |
2009 |
Waagner Biro |
Hamriyah –Dubai |
Transportation of pedestrian bridges |
2009 |
Spatial Composite |
Sharjah / RAK |
Jacking and transportation of Boeing 737 fuselage |
2009 |
FBM KNM |
Jebel Ali |
Transportation of rectors |
2009 |
Union Cement |
Ras Al Khaimah |
Change-out of motor |
2009 |
Dubal |
Jebel Ali |
Change-out of hydraulic press units |
2009 |
Sejong Emirates |
Jebel Ali |
Transportation of stack sections, 14m long x7 m diameter, 40T |
2009 |
United Printing Press |
Shahama, AUH |
Load-out of accommodation module on Leighton Stealth |
2009 |
Toledo |
Zabeel Park |
Placement of five chillers |
2009 |
Wartsila |
UAE |
Transportation of engines between factory and plant/port, up to 240T |
2009 |
Dragon Offshore |
Hamriyah, Sharjah |
Shifting of 120T spudcans |
2009 |
Logistics International |
Abu Dhabi |
Drydocking of 1,700T vessel |
2009 |
Gulftainer |
Sharjah |
Shifting of container cranes |
2009 |
Alderley |
Jebel Ali |
Jacking and shifting of various skids |
2007/09 |
United Arab Shipping |
Dubai |
Shifting of pontoons |
2009 |
Etihad Airways |
Abu Dhabi |
Lifting of flight simulator |
2009 |
Wehrhahn |
Musafah Abu Dhabi |
Shifting of autoclaves |
`2008 |
Al Mereikhi |
ShowaIsland, AUH |
Transportation of 90T girders from Ashoosh to Showa Island |
2009 |
SF Marina |
UAE |
Transport of pontoons up to 6m wide, 80T to Mina Zayed |
2008/09 |
SBM |
Musafah Abu Dhabi |
Weighing of 11,000T MopuStor |
2009 |
BK Gulf |
Burj Dubai |
FountainLake- Lowering and placement of air tanks |
2009 |
Danem Engineering |
Hamriyah |
Shifting of Diverters |
2008/09 |
Al Mereikhi |
Taweelah, AUH |
Transportation of 90T girders, Ashoosh –KhalifaPort, 900 beams |
2008/09 |
BK Gulf |
Burj Dubai |
FountainLake- Lowering and placement of transformers |
2009 |
DBB/CCC jv |
Burj Dubai Mall |
Placement of Sonic Hopper pole |
2008 |
DBB/CCC jv |
Burj Dubai Mall |
Lowering of Fokker aeroplane sections |
2008 |
EMAL |
Taweelah Emirates Aluminium Project |
Offloading of potshells by means of gantry |
2008/09 |
Agility |
Sharjah / Kabul |
Receiving 90T engines from Antonov planes in Kabul; transport to site outside Kabul |
2008/09 |
Drake & Scull |
Motor City, Dubai |
Installation of pre-assembled chillers for district cooling, up to 50T each |
2008 |
AllSeas Engineering BV |
Iran |
South Pars, phase 8 – Bushehr, Khor AmShahr - pipeline installation |
2008/09 |
Deugro |
Dubai, Al Ain |
Installation of transformers at various locations, up to 130T each |
2008/09 |
Projex |
Ghantout /Iran |
Relocation of desalination plant incl. transportation & barging, pieces up to 180 T |
2008 |
Majan Shipping |
Muscat Oman Refinery |
Transportation & installation of 2 generators & 2 turbines, up to 100 T |
2008 |
AalborgIndustries |
Hamriyah FZE |
Transportation, lifting / mating of boiler skids, weight 270T each |
2008 |
Global Ship Logistics |
Hamriya FZE / Dubai Drydock |
Load-out, seafastening & barging of three FPSO boilers weight 270T each |
2008 |
Grand Weld |
Jadaf, Dubai |
Transportation of four fully assembled crewboats, weight 180T each |
2008 |
Al Shabia |
Hamriyah |
Transportation of subsea load spreaders up to 58m long, 150T each |
2008 |
Al Faris |
ICAD |
Placing of presses of 250T each using strand jacks |
2008 |
DBB/CCC jv |
Burj Dubai Mall |
Pulling of roof structure with strand jacks |
2008 |
Aker Kvearner |
Hamriyah FZE / Dubai Drydocks |
Transportation, load-out, seafastening and barging of ship sections ith weights of up to 270T each |
2008 |
EMAS |
Hamriyah FZE |
Transportation, load-out, seafastening of ten compressor skids, 250T ea |
2008 |
Dutco Balfour Beatty |
Sh Zayed Road interchange 5.5 |
Relocation of completely assembled construction bridges |
2008 |
Archirodon |
Sh Zayed Bridge 3rd crossing, AUH |
Transportation of tower sections, main beams and arches, weights up to 525T from Jebel Ali onto client’s barge |
2007/08 |
Overseas AST |
Dubai |
Transportation & erection of pedestrian bridges throughout Dubai |
2007/08 |
Hijaz International |
Bahrain |
Lifting of 26T chillers onto 200m high-rise building using winch system |
2007 |
Johnson Arabia |
Dubai |
Installation of 90T pier caps, Dubai Metro Project, using 4-pt lifting syst |
2007 |
Spatial |
Dubai |
Relocation of completely assembled aircraft simulator |
2007 |
Overseas AST |
YasIsland |
Transportation of bridge girders for Saadiyat Island Bridge, providing engineering, management, supervision and personnel for the installation |
2007 |
BK Gulf |
Palm Island |
Installation of Heat Exchangers |
2007 |
ACMT |
Palm Island |
Lifting and placing of acrylic panels for Aquarium |
2007 |
Al Faris |
Hamriyah |
Transportation of ammonia plant units up to 40x3.5x4.5m, up to 350T |
2007 |
QGM |
Hamriyah |
Transportation of spudcans |
2007 |
Dubai Dry Dock |
Hamriyah – Dubai |
Transportation & load-out of ship sections of 270T (10x20x10m) |
2006 |
National Cement |
Dubai |
Removal of 200T concrete blocks from 5m high foundations using skidding/jacking and gantry |
2006 |
Turbine Air Systems |
Dubai |
Transportation of chiller units |
2006/07 |
Various clients |
UAE |
Transportation of various crawler cranes in different sizes |
|
Gulf Extrusions |
Dubai |
Transportation of various steel structures, Jebel Ali – Dubai Airport Expansion project |
2005/06 |
Danway |
Dubai |
Removal & re-installation of various transformers within Dubal premises |
2004-06 |
ADC Cranes |
Dubai |
Transportation of overhead cranes, 35x8m, Jebel Ali – Dubai Airport |
2006 |
Excel Engineering |
Ajman-Dubai |
Transportation of 30x9m nosedock sections for Emirates Engineering |
2006 |
A&P |
Dubai Festival City |
Installation of air handling equipment |
2006 |
Swiss International |
Burj Dubai Mall |
Installation of air handling equipment |
2006 |
Jan de Nul |
Dubai – Sudan |
Loading, transportation & offloading of Jerommeke dredger by means of submerging barge |
2006 |
DBB/CCC jv |
Burj Dubai Mall |
Transportation and installation of 25T acrylic panels and tunnel sections for aquarium |
2006/07 |
Gulf District Cooling |
Burj Dubai Mall |
Transportation and installation of 50T chiller units on elevated floor |
2006 |
BK Gulf |
Dubai |
Jumeirah Lake Towers chiller project – transportation and installation of 90T chiller units |
2006/07 |
Peremba-Intec-Sudan Pile Consortium |
Melut Basin Oil Developm’t Project |
Provision of marine equipment, engineering services and transportation of 5,500T of pipes for oil terminal from UAE to Port Sudan |
2005 |
Peeraj Group |
UAE – Dammam |
Barge transportation of land rig |
2005 |
Peremba-Intec-Sudan Pile Consortium |
Melut Basin Oil Develop’t Project |
Transportation from UAE to Port Sudan and offloading by submerging method of 270T SBP buoy |
2005 |
SBM Monaco |
MIS Sharjah, Jebel Ali Port |
Load-out and float-off of three modules FSO (2800T), MOPU (L) (2600T) & MOPU(T) (980T) by means of submerging barge for EWT Turkmenistan |
2005 |
Galadari Engineering |
Abu Dhabi |
Provision of winch and personnel for hoisting roof panels |
2005 |
SBM Houston |
Musafah – Mumbai |
Transportation of 270T SPM buoy |
2005 |
Lisa Concerts |
Doha, Qatar |
Management of barges for light show / firerework show |
2005 |
Linke Kreiling GmbH / Schmidlin |
Doha, Qatar |
Shifting by rollers of internal bridges (22 x5x2m, 40T) |
2005 |
A&P |
Dubai Marina |
Installing airhandling & chiller units inside buildings under construction |
2005 |
York International |
Umm Qasr, Iraq |
Offloading of heavy lifts (ro-ro) inside Umm Qasr Port |
2005 |
Aberdeen |
Ras Al Khaimah |
Removal & transportation of 6 diesel generators, 150T ea for scrapping |
2005 |
Al Gaith Services |
JA – Dxb Airport |
Loading & transportation of 30 overhead cranes for Emirates Engineering, up to 39x8x2m |
2005 |
Mannesman Dematic |
Jebel Ali |
Transportation & installation of overhead crane into working steel rebar factory |
2005 |
Al Habtoor Engineering |
Dubai Marina |
Shifting of 8 transfomers at transformer room |
2005 |
Al Meraikhi Precast |
Abu Al Shaoum Island Bridge, AUH |
Delivery & erection of 8 girders, 35m length |
2005 |
Tiger Steel |
Sharjah-Dubai |
Al Nakheel Snow Dome, transportation of steel structures upto 18x9x4m |
2005 |
Dubal |
Dubai |
Lifting of 2 FTA’s in position (for raising lifting height), 170T each |
2005 |
Rohde & Liesenfeld |
JA-Dubai Inv Park |
Transportation of autoclave drums, 38m x 5m dia |
2005 |
Turbine Air Systems |
Dubai |
Transportation, offloading & installation of chillers up to 50 T – Port Rashid – Dubai Marina |
2004/05 |
Swiss Engineering |
Dubai Airport |
Installation of chillers / pumps |
2004 |
ETA |
Dubai |
Placing 15 air handling units – Garden Shopping Mall |
2004 |
Ahmed Mansoor Al A’ali |
Bahrain |
Shifting & erection of GT01 diverter damper |
2004 |
Statoil Iran AS |
Bushehr, Iran |
Transportation of 2 AH11250 cranes from Jebel Ali to Bushehr |
2004 |
AllSeas Engineering BV |
Bushehr, Iran |
South Pars, phase 6, 7, 8 – pipeline installation |
2004 |
Tiger Steel |
Sharjah – Dubai |
Dubai Airport Expansion – transportation of steel works for hangars, sizes up to 38m long, 6m wide, 72T weight |
2004 |
Al Mereikhi |
Abu Dhabi |
Widening of Musafah Bridge – transportation & erection of concrete bridge beams of 35x0.8m dia and 18x0.8m dia – 266 beams in total |
2004 |
Cleveland Bridge |
Dubai |
Dubai Airport Expansion – transportation of steel work, sizes up to 35 m long, 6 m wide |
2004 |
Tiger Steel |
Sharjah |
Transportation of bridge girders 48x3.5x4m, 78T within Sharjah Emirate |
2003/04 |
Contech Engineering |
Dubai-Sharjah |
Transportation of bridge girders 48x3.5x4m, 78T to Sharjah Emirate |
2003/04 |
ETA |
Dubai |
Erection of steel girders, Al Murooj Complex |
2004 |
GPC |
Abu Dhabi |
Transportation & placing of bridge decks for Between Two Bridges City |
2004 |
Weir Westgarth |
Abu Dhabi |
Transportation & installation of 60T desalination skids |
2003 |
Al Mereikhi |
Abu Dhabi |
Transportation & erection of precast bridge beams – Abu Dhabi New Corniche Bridge |
2003 |
Cleveland Bridge |
Dubai |
Transportation of steel trusses, up to 27m long, 8m wide |
2003 |
Galadari |
Khaleej Times |
Installation of two new printing press lines |
2003 |
Abu Dhabi GHQ Marine Maintenance |
Abu Dhabi |
Lifting and placing in the water of one 70T boat |
2003 |
Al Nisr Publishing |
Dubai |
Gulf News Expansion – Installation of a new printing press line |
2003 |
SBM / GPC |
Abu Dhabi |
Xikomba FPSO conversion project – load-out of modules, weight up to 1,100T |
2003 |
SBM / GPC |
Abu Dhabi |
Mystras FPSO conversion project – load-out of modules, weight up to 1,100T |
2003 |
SBM / GPC |
Abu Dhabi |
Husky White Rose Project – load-out of turret sections, weight up to 900T |
2003 |
Contech Engineering |
Dubai – Doha |
Transportation of 27m long piles |
2002 |
SBM |
Abu Dhabi – SA |
Towage of buoy from GPC – Al Kafji, Kingdom of Saudi Arabia |
2002 |
Oman National Electric Co. |
Oman |
Relocation of DG set – Mudaibi – Khasab |
2002 |
Contech Engineering |
Dubai |
Nad Al Sheba Millennium Grandstand – transportation & erection of 1,200T structural steel |
2001 |
Lamprell |
Sharjah Port |
Rig 656 jacking work – weighing of modules |
2001 |
GPC |
Taweelah A2 proj. |
Transportation & erection of pipe racks, up to 150T per section, using gantry-mounted strandjacks |
2001 |
Noell-Imac |
AUH – Taweelah |
Handling / transportation of stacks from GPC to Taweelah A2 |
2001 |
York International |
Deira, Dubai |
Shifting of chillers at Deira Tower |
2001 |
Peeraj Group |
Saudi Arabia |
Transportation of rigs from Saudi Arabia to Abu Dhabi and vice versa |
2001-03 |
GMMOS |
Sharjah |
Load-out of soft yoke, Sharjah |
2001 |
Dubai Petroleum Company |
Fateh Terminal |
Lifting of mooring chains, Al Wasel storage barge, utilizing strand jacks |
2001 |
Aramco |
Dammam, KSA |
Handling, transportation and placing of bridge beams |
2000 |
Ramsis Engineering |
Bahrain |
Alba Coke Plant – transportation of incinerators, 25m long, 7 m dia, weights between 120T and 170T |
2000 |
Al Komed Engineering |
Bahrain |
Al Hawar Island Power Station – transportation & installation of miscellaneous power generation equipment |
1999 |
The Bahrain Petroleum Company (BAPCO) |
Bahrain |
Sitra Wharf no. 2, BAPCO refinery – removal and re-installation of condenser unit from the waterside using a barge-mounted crane |
1999 |
Noell Würzburg, Dubai |
Condor Project, Jebel Ali |
Load-out, barge transportation, offloading and placing into/onto rails of fully assembled pot room cranes |
1999 |
Noell Projects |
Maqta Bridge, AUH |
Load-out, barge transportation, placing onto bearings of the Maqta Bridge. Total weight of the main section which was placed onto its bearings in one piece was 2,700T |
1999 |
Noell / G.P.C. |
Abu Dhabi |
Terra Nova Project – load-out, barge transportation and offloading into ocean-going-vessel of buoy complete with supports |
1999 |
Noell Würzburg, Noell-Imac |
Musafa, Abu Dhabi |
Load-out, barge bransportation, offloading and placing into/onto rails of fully assembled container cranes, RGG’s and RMG’s from Abu Dhabi to various destinations around the world |
1998 - 2003 |
Technip Calberson / Barwil |
Ras Al Khaimah |
Transportation of various heavy lift items from Port Rashid, Dubai to Ras Al Khaimah Cement Factory |
1998-99 |
Abu Dhabi PWD/Overseas AST |
Abu Dhabi |
Twin Water Transmission Project – Pulling pipelines onshore by means of a rolling system and gantries |
1998 |
Comsip / Min of Electricity |
Bahrain |
Relocation of various 150 MVA transformers |
1998 |
The Bahrain Petroleum Company (BAPCO) |
Bahrain |
BAPCO Refinery, Bahrain, Sitra Wharf no. 2 – Removal and reinstallation of loading arms from waterside using a crane barge |
1998 |
Noell-Imac / Nera Maritime / Bluewater |
Abu Dhabi |
Load-out and barge transportation of various turret sections and tripods for shipment to various destinations around the world |
1996-present |
Noell Projects with Six Construct |
Abu Dhabi |
Site transportation. load-out, barge transportation and placing onto piers of bridge sections, 52mlong, 11m wide, erection height 11m above water level, weight up to 200T with the use of hydraulic platform trailers, ro-ro barges and two American Hoist 11250 Skyhorse placed on a barge |
1998 |
Contech / Waagner Biro |
Dubai City |
Transportation of pedestrian bridges, including erection at site for Dubai Municipality |
1998 |
Ballast Nedam |
Fujairah |
Van Ommeren Tank Terminal – transportation of jetty piles, up to 48 m long, from Fujairah Port to site, load-out onto barge up to lifting location |
1998 |
Ballast Nedam / Contech |
Fujairah |
Van Ommeren Tank Terminal – transportation of bridge trusses, length 45m, weight 80T from Jebel Ali to Fujairah; storage handling; load-out onto barge and lifting into position using specialised dollies, ro-ro barge and Manitowoc 4000Ringer on barge |
1998 |
Alsthom / Cegelex |
Bahrain |
Transportation and placing onto the foundations of transformers |
1998 |
Liebherr |
Khor Fakkan Port |
Installation of container cranes |
1997 |
Hutta Hegerfeld |
Dammam port |
Jacking up and re-railing of damaged container crane |
1997 |
Metro Oil Corporation |
Fujairah |
Metro Oil Refinery – Local transportation and erection of all cargo, vessels and columns for the refinery – weight up to 156T per piece |
1997 |
H.F.M. JV |
Dubai Government |
Chicago Beach Tower Project – Lifting of concrete mezzanine floor slabs and inserting them into the building |
1997 |
Khansaheb |
Thyssen/Al Futtaim |
Deira City Centre Project – Installation of various escalators inside an operational shopping mall |
1997 |
NPCC |
Zadco, AUH |
Erection of a 104m high new flare stack and interchange all guidelines of the various existing flares |
1997 |
KHD Köln |
Oman Ministry of Electricity |
Transportation and placing onto foundations of diesel generator sets from Muscat port to various power stations along the coast and in the interior. Unit weights up to 125T. |
1987-96 |
KHD Köln |
Yemen Ministry of Electricity |
Transportation of diesel generator sets to Aden, Abijan, Mukalla and Wadi Hydra Mout and installation onto foundations. The operation included reinforcement of bridges, road widening and wadi crossing. Unit weights up to 125 T |
1987-96 |
Imodco USA, Noell-Imac, Nera Maritime |
India, Korea, Singapore |
Load-out and transportation of various Calm bjoys to India Korea and Singapore to a variety of local oil companies |
1996-present |
SBM Monaco, Noell-Imac, Nera Maritime |
Various oil companies |
Load-out and transportation of various Calm buoys, offshore mooring systems, soft yoke, SBM-BTM systems from Abu Dhabi to various places in the Far East. Loads up to 750T |
1996-present |
Garmco / Raytheon |
Aluminium Plant |
Transportation and installation of aluminium rolling mill and housings |
1996 |
GPIC |
Bahrain |
Transportation of all heavy equipment, including a 240T vessel for the latest expansion |
1996 |
NSCSA / UASC |
Gulf Ports |
Offloading of all heavy lift cargo in UAE ports using floating cranes |
1993-95 |
ABB Stromberg, Vaasa |
WED Mina Station, AUH Min of Electricity & Water, Sharjah |
Interchanging seven used transformers with seven new units and disposing of the old units Transportation and placing onto the foundations of various transformers for Sharjah Power Station |
1995-97 |
IVO Helsinki |
WED AUH, Al Ain & E4 station, AUH |
Transportation and placing onto foundations of 4 transformers each, weights up to 84T |
1996 |
Sharjah Port Authority |
Khor Fakkan Port |
Turning and relocating 2 fully assembled container cranes @ 960T each |
1993 |
GIIC |
Steel Palletising Plant |
Transportation and installation of new grinding mill |
1995 |
Costain |
Das Island, AUH |
Adma/Opco / Adgas LNG plant – Temporary support of process vessels and structures during concrete and steel support rehabilitation |
1995 |
ONEC |
Oman |
Relocation of nine power stations in Oman – Transportation and placing onto foundations of diesel engines up to 125T and transportation & placing onto foundations of various transformers throughout Oman |
1984-97 |
Belleli Saudi |
Qatar |
North Field – Providing marine transportation and load-out for nine modules of up to 1350T from Jubail to offshore Qatar |
1994 |
Siemens |
Qatar |
Al Wajbah Power Station, Doha – Transportation and installation of turbines, generators and transformers up to 162T |
1994 |
Sumitomo |
Abu Dhabi, Iran |
Al Ain NW, Abu Muraika; Hormuz Island, Qesm Island, Bandar Lengeh. Transportation and installation of transformers @ 225T each from ship’s hook to foundation. Transportation, offloading by beaching and ro-ro operations of complete desalination plants with weights up to 98T |
1988-94 |
Toshiba |
Abu Dhabi |
Al Taweelah Power Station, Lot 1A, Al Ain Power Station. Transportation and installation of transformers from ship’s hook on to foundation. Weights up to 335T |
1992 |
Züblin |
Ruwais, AUH |
Gasco Processing Plant – Temporary support of process vessels and pipe racks during concrete support rehabilitation using specialized hydraulic lifting equipment |
1992-94 |
Italimpianti |
Sitra |
Sitra Desalination Plant – transportation and installation of desal units |
1983/84 |
GIIC |
Hidd |
Hidd Steel Palletising Plant – Transportation and handling of all equipment and materials for the new plant |
1983/84 |
Fiat Italy |
Umm Al Nar |
Umm Al Nar Desalination Plant – Barging, including ro-ro operations of all heavy lifts and evaporators. Weights up to 170T |
|
BBC (ABB Mannheim) |
Riffa |
Riffa Power Station, Phase I – Transportation and installation of six turbine sets |
1982-83 |
Sidem |
Umm Al Nar |
Umm Al Nar Desalination Project, phase 7&8 – Barging, including ro-ro operations of all heavy lifts and evaporators, weights up to 170 T |
|
GIE |
Iran |
Esfahan, Bandar Abbas, Kalan Power Station – transportation by ro-ro barge from Dubai to Bandar Abbas of various heavy lifts up to 140T |
|
Ital Impianti |
Umm Al Nar |
Ro-ro barging of evaporator blocks between Abu Dhabi port and Umm Al Nar Desalination plant of heavy lifts up to 140T |
|
Krupp Germany |
Delma Island, AUH |
Barging two units desalination plant by ro-ro barge from Abu Dhabi Port to Delma Island (beach landing) of heavy lifts up to 85T |
|